Resultados de la búsqueda

Para más opciones de búsqueda, vea Ayuda:Búsqueda.

No hay resultados que cumplan los criterios de búsqueda en este sitio.

Resultados de la Wikipedia en inglés.

  • Falsework consists of temporary structures used in construction to support a permanent structure until its construction is sufficiently advanced to support…
    7 kB (765 palabras) - 15:39 13 may 2024
  • 898306°W / 51.439111; -0.898306 The Loddon Bridge disaster was a collapse of falsework during construction of a reinforced concrete deck on the Loddon Bridge…
    18 kB (2390 palabras) - 08:27 17 ago 2023
  • compression, so far as is possible. Each arch is constructed over a temporary falsework frame, known as a centring. In the first compression arch bridges, a keystone…
    27 kB (2975 palabras) - 22:46 4 ene 2024
  • easily constructed at difficult crossings by virtue of using little or no falsework. Engineers in the 19th century understood that a bridge that was continuous…
    12 kB (1254 palabras) - 05:53 24 may 2024
  • to ensure column survival. Falsework fabrication: Metalworkers fabricate a falsework section from pipe and beams. Falsework erection: A section is lifted…
    106 kB (12 398 palabras) - 20:42 27 may 2024
  • precast or cast-in-place. In the context of concrete construction, the falsework supports the shuttering molds. In specialty applications formwork may…
    26 kB (3437 palabras) - 10:51 10 nov 2023
  • automobile, truck, light rail, heavy rail Span range Short Material Steel Movable Yes Design effort Medium Falsework required Site and prefabrication specific…
    6 kB (498 palabras) - 00:24 5 may 2024
  • Young Galaxy (redirección desde Falsework (album))
    Galaxy Re-Team with Dan Lissvik for 'Falsework'". exclaim.ca. Retrieved August 4, 2015. "Young Galaxy - Falsework". Discogs. October 30, 2015. Retrieved…
    8 kB (699 palabras) - 05:04 12 feb 2024
  • 2000. If made of concrete, box girder bridges may be cast in place using falsework supports, removed after completion, or in sections if a segmental bridge…
    8 kB (875 palabras) - 03:36 28 mar 2024
  • The Gagarin Street Bridge [ru] in Arkhangelsk, Russia. Construction falsework on left; force schematic on right Elevation and plan view of single-tower…
    7 kB (691 palabras) - 07:08 25 abr 2024
  • "slip-form" construction, where the falsework moves (slips) upward following sequential concrete "pours." The falsework uses the newly constructed concrete…
    9 kB (1129 palabras) - 12:59 2 jun 2023
  • and support the incoming beam. Falsework consists of temporary structures used to support a permanent structure. Falsework need to have accurate calculation…
    9 kB (1162 palabras) - 01:26 9 may 2024
  • and installing cabinets. Formwork carpenter creates the shuttering and falsework used in concrete construction, and reshores as necessary. Framer is a…
    27 kB (3266 palabras) - 19:30 2 may 2024
  • act as a cantilever. This is very helpful when temporary supports, or falsework, cannot be used to support the structure while it is being built (e.g…
    18 kB (2120 palabras) - 22:29 28 feb 2024
  • concrete, prestressed concrete, masonry Movable No Design effort medium Falsework required available for use, since viaducts are all composed of low bridges…
    9 kB (979 palabras) - 18:39 22 abr 2024
  • suspension bridge types, this type often is constructed without the use of falsework. The suspension cables must be anchored at each end of the bridge, since…
    43 kB (4717 palabras) - 09:20 29 may 2024
  • truck, light rail, heavy rail Span range Short Material Steel Movable Yes Design effort medium Falsework required Depends upon degree of prefabrication…
    4 kB (420 palabras) - 17:53 5 may 2024
  • and 200. Carries Pedestrians, Road vehicles, Rail Vehicles Span range Short Material Timber, steel Movable No Design effort Low Falsework required None…
    27 kB (2996 palabras) - 22:01 8 may 2024
  • Heavy rail Span range Short Material Timber, iron, steel, reinforced concrete, prestressed concrete Movable No Design effort Low Falsework required No…
    10 kB (1172 palabras) - 06:51 18 nov 2023
  • high winds. Some of the falsework timbers were 10 by 10 inches (250 mm × 250 mm). It took two months to construct the falsework alone. When high waves…
    57 kB (6583 palabras) - 05:25 4 mar 2024
  • range Medium Material structural steel Movable No Design effort Medium Falsework required Sometimes, but long spans are often built using temporary cantilevers…
    3 kB (284 palabras) - 05:15 22 ene 2024